After the forms are finished, the road crush will be set down then the concrete will be poured. It is SO exciting to see something positive, something going up rather than being torn out.
However, we must return to the evils of water: more in the basement last week. Why? The Usual Suspects: Poor grading still. Eaves troughs are hosting wee trees. Possibly weeping tile full of sediment. Today's worries: drain/ re-do the weeping tile? Put up new eaves troughs? There's little point in fixing the grade if the downspouts aren't working!!
No comments:
Post a Comment